Building Progress

Pond and Parking Lot

 Permanent link

Work continues at the new building site. The ponds are being dug out, the parking lot on the east side is being graded and the front entrance pre-cast is now being installed.

 

These pictures were taken on May 1st, 2008.

New Building 20080501 001 New Building 20080501 002 New Building 20080501 003

Roof and Floor progress

 Permanent link

The permanent roof is almost 100% complete, concrete floor on first floor is being poured and the raised flooring is starting to be installed on second floor.

 

These pictures were taken on April 9th, 2008.

New Building 20080409 001 New Building 20080409 002 New Building 20080409 003

Floor work

 Permanent link

The cement floor on first floor is ready to pour, the raised floor on second is being installed and the pre-cast is almost totally complete except for the front entrance.

 

These pictures were taken on April 2nd, 2008.

New Building 20080402 001 New Building 20080402 002 New Building 20080402 003

Moving Inside

 Permanent link

The building is almost entirely enclosed and we have started heating a portion of the interior so that insulation, caulking, stud walls and other interior work can begin.

 

These pictures were taken on March 19th, 2008.

New Building 20080319 001 New Building 20080319 002 New Building 20080319 003

Enclosing with Walls and Windows

 Permanent link

The pre-cast walls are going up fast now and the windows are starting to go in. Work has also started on the roofing, insulation, storm sewers and even some interior plumbing. All of the pre-cast walls, with the exception of the entrances, should be up by the end of February.

 

These pictures were taken on February 13th and 20th, 2008.

New Building 20080213 001 New Building 20080220 001 New Building 20080220 002

Adding the Cafeteria

 Permanent link

With some of the pre-cast walls attached, they were able to work on adding the steel structure of the cafeteria.

 

These pictures were taken on January 30th, 2008.

New Building 20080130 001 New Building 20080130 002

Raising the Walls

 Permanent link

Work has begun on the pre-cast walls.  The pictures below show the south side of the building.

 

These pictures were taken on January 23rd, 2008.

New Building 20080123 001 New Building 20080123 002

Calendar

<< May 2008 >>
Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

RSS Feed

RSS Feed

Archive