Building Progress

Moving Along

 Permanent link

The mechanical room is starting to fill up, the front entrance/drive up is in the final stages of completion and the restrooms on some of the floors are close to being completed.

 

These pictures are current as of August 20th, 2008.

New Building 20080820 001 New Building 20080820 002 New Building 20080820 003

Patio Pond

 Permanent link

Work continues on the new building site with an anticipated move date of mid-February. The footings for the retaining wall at the patio pond have been poured, ceramic tile in the restrooms is being installed and the main entrance is starting to take shape.

 

These pictures are current as of August 7th, 2008.

New Building 20080807 001 New Building 20080807 002 New Building 20080807 003

Asphalt Begins

 Permanent link

The southeast parking lot is getting the first layer of asphalt poured, the fronts of the individual offices are being framed, and work is beginning on the outside plaza and retaining wall.

 

These pictures are current as of July 21st, 2008.

New Building 20080721 001 New Building 20080721 002 New Building 20080721 003

Parking Lot

 Permanent link

The East parking lot is really starting to take shape, the electrical/data lines are being pulled and breaker boxes installed and there is some painting being done in the New Business area.

 

These pictures are current as of July 7th, 2008.

New Building 20080707 001 New Building 20080707 002 New Building 20080707 003

Soggy Persistence

 Permanent link

Progress continues to move forward on the interior work. Outside work has slowed some due to the weather conditions but some progress is made between rain storms. Some mechanical pumps are being installed for the geo-thermal HVAC system, perimeter offices are being framed and sheet rocked, the atrium is taking shape and the cafeteria glass has been installed.

 

These pictures were taken on May 27th and June 3rd, 2008.

New Building 20080611 001 New Building 20080611 002 New Building 20080611 003 New Building 20080611 004 New Building 20080611 005

Pond and Parking Lot

 Permanent link

Work continues at the new building site. The ponds are being dug out, the parking lot on the east side is being graded and the front entrance pre-cast is now being installed.

 

These pictures were taken on May 1st, 2008.

New Building 20080501 001 New Building 20080501 002 New Building 20080501 003

Roof and Floor progress

 Permanent link

The permanent roof is almost 100% complete, concrete floor on first floor is being poured and the raised flooring is starting to be installed on second floor.

 

These pictures were taken on April 9th, 2008.

New Building 20080409 001 New Building 20080409 002 New Building 20080409 003